The terminal is a liquefied natural gas (LNG) transfer centre located in the Deep Water Port main port area and is part of the Deep Water Port Master Plan. The steel pipe pile coating anti-corrosion technology project totaled 149 steel pipe piles, covering an area of about 4750 square meters